Case Study
Perth Children’s Hospital
Location
Nedlands, Western Australia
Client
John Holland Group
Completion Date
July 2015
Scope
Construction of hydrotherapy pool for Trisley Hydraulics. Built on the 4th floor the pool includes anti vibration pads for acoustic dampening and the installation of HDPE reinforced balance tank. This pool is fully tiled and has hand rails that surround the pool. The hi-tech filtration system is located at a lower level and is computer operated.
Outcome
Completed 12 months ahead of scheduled timeframe and on budget.